Bridge Brakes & Components for Heavy Movable Structures
 

Home

 

Vertical Lift Bridge
Case Study

Bridge Brake Replacement or Rebuild Service Case Study

Barge Loading Boom Winch Replacement Case Study

Mondel Stainless Steel Bridge Brakes Case Study

Infrastructure Projects Boost the Economic Recovery

 

Contact Us

 

Email Newsletter



Download the new Magnetek Heavy Moveable Structures catalog.
 

Engineered Lifting Systems, LLC
1632 Headland Drive
Fenton, MO 63026 USA
 
Phone 866-756-1200
Fax 866-756-1202
sales@engineeredlifting.com

 

 

Last Updated
May 08, 2013

Content Copyright © 2011-2012 All Rights Reserved.

Web Services by
Ron Castle Webs

Links

Sitemap

 

Vertical Lift Bridge Brake Case Study

Engineered Lifting Systems had to change a brake on a vertical lift bridge. This is an excellent example of what we can do for any bridge that needs new brakes. The old brake was worn and even had a bungee cord around it to keep the brake working. Shown below are a few pictures illustrating the old brake setup.





DESCRIBE BRAKE PROBLEM. Shown below is the new brake shown after it was installed into the bridge system.

The vertical lift bridge with the new brake worked out very well and the customer has been very happy with it since.
 

   

Top